Български English

Municipality of Gotse Delchev
2900 Gotse Delchev, 2 Tsaritsa Joanna Str

Re - enforce Optimal Actions and
Development Strategies
Roads | Re - enforce Optimal Actions and Development Strategies

About the project

PROJECT TITLE:
"Re - enforce Optimal Actions and
Development Strategies",
ROADS
SUBSIDY CODE AND DATE OF THE SUBSIDY CONTRACT
B2.21.02/17.02.2012
Project Duration
24 months
TOTAL BUDGET OF THE PROJECT
€ 2 677 473,93
LEAD PARTNER
Municipality of Gotse Delchev

Objectives of the project

Roads - road

The overall objective of the project is to improve the road network in the region of Gotse Delchev and Oraiokastro as a mean of social and economic development of the cross-border area.

Improving and enhancing the transport infrastructure of these two areas contribute to the promotion of its sustainable development and cohesion, mitigating regional disparities and help the safety of passengers and visitors in the area of Gotse Delchev and Oraiokastro.

The specific objectives of the project are:

  • Improvement of the condition of the alternative road BLG 3099 Breznica-Charka of the I-st class international road ІІ 19 “Simitly-Razlog-Bansko-Gotse Delchev-cross-border point Ilinden-Ehsohi” and to improve the road access to the part of the National Park “Pirin”, situated on the territory of Gotse Delchev municipality and other natural objects.
  • To improve the condition of the central municipal road Pentalofos – Neochorrouda, Municipality of Oraiokastro, as a connection with the Egnatia odos.
  • To create a good conditions for local economical and social development;
  • To improve the mobility of goods, services and people in the cross-border area

Project activities

  • Activities for information and publicity include informational events, design and elaboration of brochures and billboards; organization of a conference with title: "TRANSPORT SAFETY IN CROSS BORDER AREA"
  • Reconstruction work of road Breznica-Charka with length 5,5 km including surface leveling, putting up asphalted concrete, construction of drainage facilities, road markings and crash barriers;
  • Supervision and author supervision during the construction works;
  • Introduction of the facility into exploitation;
  • Preparation of working project for the second section of the road connecting the municipality of Gotse Delchev with the Municipality of Bansko, alternative connection with international road II-19 Simitly Gotse Delchev-Ilinden-Ehsohi, Republic of Greece;
  • Reconstruction of road Pentalofos – Neochorrouda -1,4 km.

Project outputs

  • Joint project team formed; Progress reports written; Subcontracting documentation prepared; Audited project implementation and supervised construction; 1 work design prepared for the second phase Charka-Dobrinishte; 6.9 km road infrastructure reconstructed;
  • Reconstruction of road Brezneca-Charka of the I-st class international road “Bansko-Gotse Delchev-cross-border point Ilinden-Ehsohi” - length 5 500 m, width 6-8 m; rehabilitation of of the road surface, 21 pipe structures, 2 bridges;
  • Reconstruction of the central municipal road Pentalofos – Neochorrouda, Municipality of Oraiokastro, as a connection with the Egnatia Odos with length 1 400 m, width 10,5 m.
European Territorial Cooperation Programme Logo
Община Гоце Делчев Logo
This website is created in the frameworks of the Subsidy contract B2.21.02 from 17.02.2012 under
The European Territorial cooperation program Greece – Bulgaria 2007 – 2013,
Project "Re - enforce Optimal Actions and Development Strategies", ROADS, co-funded by the European Union
through the European Regional Development Fund and the National funds of Greece and Bulgaria.
The whole responsibility of the content of this website is bore by Municipality of Gotse Delchev and under no circumstances can be considered that this website presents
the official statement.